So far, the group tutorial 1 my group did was successful.
The tutorial was doing a report and design a space planning for our event.
Manage to apply at least 2 CP code to it which is CP 27 and CP 55.
As the accountant of the team, have to plan the budget for our event. The estimated cost for the Feline Fiesta. As a group, we had to plan properly the cost and items used. Overall, we managed to complete our report and drawing and hand in it on time. I am fortunate to be teamed up with my current group. :DD
The tutorial was doing a report and design a space planning for our event.
Manage to apply at least 2 CP code to it which is CP 27 and CP 55.
As the accountant of the team, have to plan the budget for our event. The estimated cost for the Feline Fiesta. As a group, we had to plan properly the cost and items used. Overall, we managed to complete our report and drawing and hand in it on time. I am fortunate to be teamed up with my current group. :DD